Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas online more than two weeks ago
Candidate
Male, 51 year, born on 1 June 1973
Novy Urengoy, willing to relocate, not prepared for business trips
Lead Supervisor
10 000 $ in hand
Specializations:
- Other
Employment: full time
Work schedule: full day
Work experience 21 year 2 months
April 2016 — currently
9 years 1 month
construction / commissioning
www.linkedin.com/in/serdar-g%C3%B6z%C3%BCye%C5%9Fil-a179803?trk=nav_responsive_tab_profile
Construction coordinator
KEY CONTRIBUTIONS:
▪ Coordinate the entire scope of AGI works at LOT-2 Section (56’’ Block Valve Stations, Pig Stations, etc).
▪ Monitoring technical performance, competence, and progress of multi-discipline Superintendents, Contractors, and Vendors.
▪ Attend progress meetings on behalf of SYA jv.
August 2015 — May 2016
10 months
construction
Russia
Construction manager
KEY CONTRIBUTIONS:
▪ Prepared cost estimates, budgets, and work timetables; coordinated heavy lifting activities.
▪ Managed equipment installations and E & I Works; coordinated preservation and maintenance activities.
▪ Coordinated piping prefabrications and installations.
March 2014 — September 2015
1 year 7 months
construction
Kazakhstan
Construction manager
▪ Scheduled the Plant Firewater Upgrade Project (PFU) in logical steps and within budget/time constraints required to meet deadlines.
▪ Coordinated PFU project construction activities including fire water and utility water pump houses, fire hydrant pits, valve pits, and underground/above-ground piping.
▪ Controlled the quality/quantity of the completed construction works, and controlled the observance of safety measures and environmental protection.
May 2006 — April 2013
7 years
Maintenance & Operation
Maintenance Team Leader
KEY CONTRIBUTIONS:
▪ Led Cured Oil Pipeline, Pump Station, and Block Valve Stations (AGI) maintenance and overhaul activities.
▪ Managed vendor representatives and supervisors experienced in working with multinational groups and crews.
▪ Maintained stock inventories at levels in accordance with the Maintenance Management System.
▪ Reviewed mechanical maintenance procedures, Maximo Maintenance Program, and Job Plans.
▪ Trained for HSE (Health, Safety, and Environment), PPE (Personal Protective Equipment), LOG OUT & TAG OUT systems to improve personnel awareness.
May 2003 — June 2006
3 years 2 months
Commissioning
Commissioning Lead Engineer
KEY CONTRIBUTIONS:
▪ Reviewed Methods of Statements and Risk Assessments, and worked with LO-TO and Turnover Package systems.
▪ Supported commissioning and start up activities at Ceyhan Marine Terminal of Crude Oil Storage Tanks, 100.000 m3/each totaling seven tanks and related process piping and equipment.
▪ Implemented API, and ASME standards for below ground and above ground facilities.
Skills
Skill proficiency levels
About me
SERDAR GÖZÜYEŞİL
Adana, Turkey | +90 533 2804968 | sgozuyesil@yahoo.com
CONSTRUCTION MANAGER
A highly skilled, well regarded, dedicated, and seasoned Team Leader/Mechanical Engineer with more than 18 years of comprehensive experience in Construction, Commissioning, Plant Operations, and Maintenance. Experienced in multimillion-dollar industrial turn-key Oil & Gas, Energy projects such as pipelines, power plants, and other industrial investments. Advanced expertise in mechanical flow diagrams, piping drawings, and general arrangement drawing. Extensive experience in maintenance and repair of equipment. Multi-discipline management of civil, electrical, instrument control, mechanical, and environmental issues. Able to serve as incident commander during emergency situations such as oil spills. Adept at developing teams and individuals through team processes and performance management. Able to ensure compliance with Health, Safety, Environmental (HSE) standards; maintain up-to-date HSE competencies through formal trainings. Strong project management and problem-solving skills. Familiarity with concepts, practices, National Consensus Standards, and procedures within the Mechanical Engineering discipline. Superior communications and technical writing skills. Well versed in setting company maintenance policies and in monitoring compliance.
AREAS OF EXPERTISE
Construction Management ~ Compliance ~ Health, Safety, Environmental ~ Team Training ~ Oil & Gas Plants ~ AGI (Above Ground Installations) ~ Commissioning & Start Ups ~ Computerized Maintenance ~ Project Oversight ~ Policies/Procedures ~ Cost Estimates/Budgets ~ AutoCAD/EPC ~ Pipelines ~ Power Plants (Boiler, Turbine, FGD Units) ~ Management System (Maximo) ~ Pump/Compressor Stations ~ Microsoft Project ~ B Class Driving License ~ Microsoft Office Suite ~ Turkish/English/Russian
PROFESSIONAL EXPERIENCE
SICIM - YUKSEL - AKKORD (SYA) JV, ERZINCAN, TURKEY 5/2016 – PRESENT
PROJECT COORDINATOR - AGI (ABOVE GROUND INSTALLATIONS)
Serve as the coordinator for the Trans Anatolian Naturel Gas Pipeline Project (TANAP).
KEY CONTRIBUTIONS:
▪ Coordinate the entire scope of AGI works at LOT-2 Section (56’’ Block Valve Stations, Pig Stations, etc).
▪ Monitoring technical performance, competence, and progress of multi-discipline Superintendents, Contractors, and Vendors.
▪ Attend progress meetings on behalf of SYA jv.
RENAISSANCE HEAVY INDUSTRIES, YAMAL, RUSSIA 9/2015 – 4/2016
CONSTRUCTION MANAGER
Oversaw construction of YAMAL CWP3B Package, co-managed by Renaissance Heavy Industries – Gama Industrial Plants JV as sub-contractor of South Tambey LNG company. Project included Modules Hook-up Works, Mechanical Works, Piping Works, EPC (Engineering/Purchasing/Construction) Tanks/Buildings, Electrical and Instrumentation Works. Units consisted of large, manufactured modular units which were considered as extraordinary, and were transported to the construction site due to rough weather conditions including permafrost characteristic of the ground. All parts of the plant to be constructed were raısed above the steel platforms that were assembled on piles.
KEY CONTRIBUTIONS:
▪ Prepared cost estimates, budgets, and work timetables; coordinated heavy lifting activities.
▪ Managed equipment installations and E & I Works; coordinated preservation and maintenance activities.
▪ Coordinated piping prefabrications and installations.
BECHTEL – ENKA JV, TBILISI, GEORGIA 5/2015 – 9/2015
DEPUTY SITE MANAGER
Worked on the South Caucasus Pipeline Expansion Project as part of the Shah Deniz Full Field Development project, which involved the laying of new pipeline across Azerbaijan and the construction of two new compressor stations in Georgia. Project tripled the gas volumes exported through the pipeline to over 20B cubic meters per year. CSG-1 was collocated with an existing pumping station (PSG1) on the BTC. Cured Oil Pipeline occupied an area of approximately 53. Ha, Equipment. Received the pipeline integrity gauges (PIG) that travelled inside the pipeline from Azerbaijan, and launched them up the 56” and 42” pipelines.
KEY CONTRIBUTIONS:
▪ Prepared Equipment Installation Plans and a Readiness Matrix for all plant equipment and piping systems.
▪ Organized all subcontractor job packages.
▪ Coordinated heavy lifting and preservation activities.
▪ Assembled the construction crew, comprised of direct and indirect personnel.
BECHTEL – ENKA JV, TENGIZ, KAZAKHSTAN 9/2014 – 5/2015
PROJECT CONSTRUCTION MANAGER
TENGIZCHEVROIL / TENGIZ Oil Complex, Plant Firewater Upgrade (PFU) Project
KEY CONTRIBUTIONS:
▪ Scheduled the Plant Firewater Upgrade Project (PFU) in logical steps and within budget/time constraints required to meet deadlines.
▪ Coordinated PFU project construction activities including fire water and utility water pump houses, fire hydrant pits, valve pits, and underground/above-ground piping.
▪ Controlled the quality/quantity of the completed construction works, and controlled the observance of safety measures and environmental protection.
BECHTEL – ENKA JV, ERBIL, IRAQ 3/2014 – 9/2014
CONSTRUCTION MECHANICAL SUPERINTENDENT
Project was for the construction of ERBIL & DOHUK 1500 MW Combined Cycle Power Project, which included the design, engineering, procurement, shipment, delivery, installation construction, interconnection, pre-commissioning, commissioning, and start-up of eight HRSGs, two nominally-rated 250 MW GE STGs, two GSUs, a cooling system and all other balance of plant equipment to convert the simple cycle plant to a 4 x 4 x 1, two block configuration combined cycle project as well as demonstration of parallel operation with the grid at the required net output. Completed performance testing, classroom training of the operating and maintenance personnel, and preparation of integrated operation and maintenance manuals.
KEY CONTRIBUTIONS:
▪ Coordinated rotation and static equipment installation works.
▪ Coordinated Auxiliary Systems Piping and Large Process Piping-spring hanger installations and adjustments.
▪ Managed Air Cooled Condenser (ACC) – PTT tests.
ÇALIK ENERGY, GENERAL ELECTRIC, MARY, TURKMENISTAN 9/2013 – 3/2014
CONSTRUCTION MECHANICAL SUPERINTENDENT
Construction of Mary-2 Simple Cycle Power Plant (EPC) / 3 x GE LM6000- TURKMENISTAN. CALIK ENERGY. Provided services as an EPC contractor for six power plants, one power transmission/distribution and two switchyard projects in Turkmenistan. Experience included project construction, procurement, and logistics.
KEY CONTRIBUTIONS:
▪ Planned, scheduled, and managed all activities related to daily project tasks.
▪ Coordinated 3x LM 6000 gas turbines installations and commissioning; coordinated auxiliary systems piping and equipment installation.
▪ Led groups of field engineers and technicians or multi-disciplinary teams.
BP/BTC - CRUDE OIL PIPELINE OPERATOR/BOTAS INT LTD, ANKARA, TURKEY 7/2006 – 8/2013
MAINTENANCE TEAM LEADER
BAKU-TBILISI-CEYHAN Crude Oil Pipeline Operator (BIL) has been restructured in order to operate the BTC – Baku-Tbilisi-Ceyhan Crude Oil Pipeline as Contractor of BP. BOTAŞ International Limited (BIL) is the Designated Operator of Turkish Section of Baku-Tbilisi-Ceyhan Crude Oil Pipeline. Led the Pump Station and Pipeline Maintenance Teams in the performance of operations and maintenance activities of the Pump Station Facilities aligned with the requirements of the Operations Agreement, prevailing legislation, and Company regulations. Performed preventive maintenance routines, failure analyses, and corrective maintenance tasks on equipment including block valve stations, valves, pumps, boilers, compressors, motor bearings, and drive mechanisms. Helped to determine the needs for maintenance and overhaul activities such as spare parts, hand tools, and maintenance equipment. Worked with the Supply Control Manager to ensure continuous and adequate supply of spare parts for pump stations including consumable/operating spare parts, capital equipment, and facility spare parts.
KEY CONTRIBUTIONS:
▪ Led Cured Oil Pipeline, Pump Station, and Block Valve Stations (AGI) maintenance and overhaul activities.
▪ Managed vendor representatives and supervisors experienced in working with multinational groups and crews.
▪ Maintained stock inventories at levels in accordance with the Maintenance Management System.
▪ Reviewed mechanical maintenance procedures, Maximo Maintenance Program, and Job Plans.
▪ Trained for HSE (Health, Safety, and Environment), PPE (Personal Protective Equipment), LOG OUT & TAG OUT systems to improve personnel awareness.
BP/BTC - CRUDE OIL PIPELINE CONTRACTOR BTC DIRECTORATE, ANKARA, TURKEY 6/2003 – 6/2006
SENIOR CONSTRUCTION & COMMISSIONING ENGINEER - AGI (ABOVE GROUND INSTALLATION)
The BTC P/L Project Directorate has been established on 5 January 2000 within BOTAS which has been nominated as the Turnkey Contractor to implement the Turkish Section of the BTC Cured Oil Pipeline Project through delivery of the requirements of the Turnkey Agreement in terms of cost, quality and schedule. Tasked with monitoring work and ensuring adequate supervision of contractor mechanical, civil, and electrical activities including 42’’ Actuator-Operated Main Valves, Bypass Lines, SCADA Containers, electrical wiring, instrumentation, attachments, piping, fittings, and associated appurtenances. From the first establishment of the BTC Pipeline, took an active role during manufacturing, installation, commissioning, start-up, and operation of Block Valve Stations.
KEY CONTRIBUTIONS:
▪ Reviewed Methods of Statements and Risk Assessments, and worked with LO-TO and Turnover Package systems.
▪ Supported commissioning and start up activities at Ceyhan Marine Terminal of Crude Oil Storage Tanks, 100.000 m3/each totaling seven tanks and related process piping and equipment.
▪ Implemented API, and ASME standards for below ground and above ground facilities.
GAMA - TEKFEN - TOKAR JV, K. MARAS, TURKEY 5/2001 – 5/2003
SENIOR MECHANICAL CONSTRUCTION & COMMISSIONING ENGINEER
Construction of 4 x 360 mw AFSIN - ELBISTAN - B Coal fired thermal power plant.
KEY CONTRIBUTIONS:
▪ Coordinated the installation and commissioning of all FGD systems Equipment (Gypsum Dewatering Systems, Rotating Equipment installations and commissioning, Wet Ball Mill, Tanks and Agitators, Gas Ducts, Conveyor Systems, Absorber Scrubber Tanks, Limestone-Coal Conveyor Systems, Crusher Building Piping, equipment installations, and commissioning.
▪ Coordinated all FGD (Flue Gas Desulphurization) Systems Process and Utility Piping Prefabrication, Installation and Inspection (SS, CS, Alloy31, FRP)
GAMA INDUSTRIAL PLANTS MANUFACTURING & ERECTION CO, MUGLA, TURKEY 5/1999 – 5/2001
MECHANICAL CONSTRUCTION & COMMISSIONING ENGINEER
Construction of Flue Gas Desulphurisation Plant (FGD) with wet limestone process for 3x210 MW KEMERKOY Thermal Power Plant Units.
KEY CONTRIBUTIONS:
▪ Followed up on installation and commissioning of all FGD systems Equipment (Gypsum Dewatering System, Rotating Equipment installation and commissioning, Wet Ball Mill, Tanks and Agitators, Gas Ducts, Conveyor Systems, Absorber Scrubber Tanks, Limestone-Coal Conveyor Systems and Crusher Building Piping/Equipment Installation and Commissioning.)
▪ Followed up all FGD (Flue Gas Desulphurization) Systems Process & Utility Piping Prefabrication, Installation and Inspection (SS, CS, Alloy31, FRP).
▪ Prepared Methods of Statements and work instructions.
TEKNOKON CONSTRUCTION INC. ADANA, TURKEY 5/1997 – 5/1998
PIPING SUPERVISOR
Modernization of SASA Adana DMT Plant- Turkey (Equipment installation and piping work for Dimethyl Terephthalic Acid Plant and Utilities)
KEY CONTRIBUTIONS:
▪ Followed – up on process piping spool prefabrications and installations (jacket–steam trace pipe SS / CS 10’’).
▪ Monitored the works to ensure adequate supervision of the mechanical activities such as steam lines, Valves, oil lines, Instrumentation, attachments, piping, pressure vessels, nozzles, fittings and associated appurtenances.
EDUCATION & TRAINING
▪ ÇAĞ University, Mersin, TURKEY - MBA Master Degree, 2008
Maintenance Management Systems, Reengineering, Corporate Governance
▪ SELÇUK University, Konya, TURKEY - MECHANICAL ENGINEERING Degree, 1997
Production Techniques, Organization, Construction Engineering, Quality Management
▪ TECHNICAL High School, Adana, TURKEY - ELECTRONIC Technician Degree, 1990
General Electric Systems, Protection and Instrument Systems, Electro Technical
▪ IOSH Managing Safely Training, UK, 2015
▪ QED Associates, BTC - BP, 2012, GOC MANCON SYSTEM Training (Completion)
▪ AMERICAN – TURKISH ASSOCIATION, 2007, Professional English Language Learning
▪ ABB, 2012, ICSS Training (Instrument Control Safety Systems)
▪ MBH international, 2012, Effective Communication Skills Training
▪ Donusen Adam, BTC, BP, 2012, Incident Investigation Training
▪ JMJ Associates, BTC – BP, 2011, Risk Assessment Training
▪ HED Associates, BTC- HURMOGLU, 2013, Safe Driving Techniques (OFF –ROAD/DEFENSIVE)
▪ MAXIMO & BP, 2011, MAXIMO Maintenance Programme Training
▪ FINLAND – WARTSILA, 2008, WARTSILA Motors Training
▪ Fleming Group, Barcelona, SPAIN, 2013, 6th Annual Pipeline Integrity Management Forum
Higher education (master)
1996
selcuk university
mechanical engineering, Development and Operation of Oil and Gas Fields
Languages
Citizenship, travel time to work
Citizenship: Russia, Turkey
Permission to work: Russia, Turkey
Desired travel time to work: Doesn't matter